- Community Home
- >
- Networking
- >
- Switching and Routing
- >
- HPE Aruba Networking & ProVision-based
- >
- Joining two STP loops - need some help
Categories
Company
Local Language
Forums
Discussions
Forums
- Data Protection and Retention
- Entry Storage Systems
- Legacy
- Midrange and Enterprise Storage
- Storage Networking
- HPE Nimble Storage
Discussions
Forums
Discussions
Discussions
Discussions
Forums
Discussions
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
- BladeSystem Infrastructure and Application Solutions
- Appliance Servers
- Alpha Servers
- BackOffice Products
- Internet Products
- HPE 9000 and HPE e3000 Servers
- Networking
- Netservers
- Secure OS Software for Linux
- Server Management (Insight Manager 7)
- Windows Server 2003
- Operating System - Tru64 Unix
- ProLiant Deployment and Provisioning
- Linux-Based Community / Regional
- Microsoft System Center Integration
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Community
Resources
Forums
Blogs
- Subscribe to RSS Feed
- Mark Topic as New
- Mark Topic as Read
- Float this Topic for Current User
- Bookmark
- Subscribe
- Printer Friendly Page
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
07-06-2012 12:11 PM
07-06-2012 12:11 PM
Joining two STP loops - need some help
Got the run around from HP call in support so I am reaching out in the forums.
I have two buildings - each running STP loops. Plant 1 is running Instance 1 and Plant 3 is running Instance 3. They work fine. Now it is time to put a redundant link between the two plants. I added Instance 3 to my core switch that sits in Plant 1. Although it looked to be working, I had one vlan not routing properly inside plant 1 and VoIP quality was suffering between the two plants. I rolled back the changes and disabled the redundant link port on my core switch and everything was fine again.
I once ran across a document showing th ecombination of MSTP loops but can't find it again. Know this can't be that difficult but Just can't find an easy answer.
Part of the issue is I have the same vlans being used in both loops and HP will only let one instance handle a vlan. Can't put it in both instances.
Any help would be appreciated.
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
07-07-2012 12:40 AM
07-07-2012 12:40 AM
Re: Joining two STP loops - need some help
MSTP has some specific rules, and the common use case is to have half the VLANs (eg odd-numbered) in instance 1, and the other half (eg even-numbered) in instance 2. This is usually done in conjunction with a gateway redundancy protocol like VRRP.
Perhaps the simplest thing to do is not have any instances and just put both buildings into the common instance (CIST). It isn't clear if that would be appropriate or suitable for your environment and requirements though.
There is reference to a doc "How to configure Multiple Spanning-tree (MSTP) on HP ProCurve switches" that may be useful (you may have more luck finding the PDF online).