Hi,
I've been asked to investigate the impact of collapsing 3 of the 4 nPartitions we currently have running within our HP RX8620.
One of these hosts is alrady pushing I/O quite heavily on occasion and my question is, will collapsing 2 additional hosts and merging the I/O through one server create a further bottleneck ?
Currently each server is dual attached through fibre channel cards to the EVA 5000 using securepath for multipath software. If we were to also move the existing fibre channel cards into this new merged server (thus increasing the number of active paths for "round robin") would we expect to be able to handle more IO as a result ?
Thanks in advance (points as usual).
G.