Relay Rack Installation of Proliant Servers

 
Will Beene
New Member

Relay Rack Installation of Proliant Servers

Installing Proliant Servers or any other type of equipment into a 19" Relay Rack requires 2 Post Conversion Brackets.

These Brackets convert a 19" 2 Post Relay Rack into a standard 19" 4 Post Rack.

This method allows the use of the Standard Slide Rail and Cable Management Assemblies.

This is HPs preferred installation method for 2 Post Relay or Telco Racks.

Additional information about these products can be found at: RackSolutions.com/Compaq

If there are any questions regarding RackSolutions Products or Installation Methods please don't hesitate to contact me.