- Community Home
- >
- Servers and Operating Systems
- >
- HPE ProLiant
- >
- Server Management - Systems Insight Manager
- >
- Re: Lack of usability in SIM 4.1
Categories
Company
Local Language
Forums
Discussions
Forums
- Data Protection and Retention
- Entry Storage Systems
- Legacy
- Midrange and Enterprise Storage
- Storage Networking
- HPE Nimble Storage
Discussions
Forums
Discussions
Discussions
Discussions
Forums
Discussions
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
- BladeSystem Infrastructure and Application Solutions
- Appliance Servers
- Alpha Servers
- BackOffice Products
- Internet Products
- HPE 9000 and HPE e3000 Servers
- Networking
- Netservers
- Secure OS Software for Linux
- Server Management (Insight Manager 7)
- Windows Server 2003
- Operating System - Tru64 Unix
- ProLiant Deployment and Provisioning
- Linux-Based Community / Regional
- Microsoft System Center Integration
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Discussion Boards
Community
Resources
Forums
Blogs
- Subscribe to RSS Feed
- Mark Topic as New
- Mark Topic as Read
- Float this Topic for Current User
- Bookmark
- Subscribe
- Printer Friendly Page
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
07-12-2004 01:54 AM
07-12-2004 01:54 AM
Lack of usability in SIM 4.1
I have found some serious backward design issues in the new HP SIM 4.1 from CIM 7.
When trying to make a Task Event you have to go through so many drop down menus, not to mention so many different pages. CIM 7 allowed for a java window to load up and give you a list of all catagories that allowed you to expand the branches and select multiple Queries, events or devices for tasks that are being configured.
Also most of the sections were configurable from one screen not from going back and forth like HP SIM. It is extremely frustrating having to go through each drop down menu trying to figure out what is where and what is associated with what. Having that one single java window allowed a much easier look at what needed to be added (Saves time and manageble cost). Will HP be changing this in the near future to something close to what CIM 7 had.
Another thing that CIM 7 had that is not in SIM 4.1 is the ability to create an task (notification in this sense) from the list of events (by selecting the event and then selecting create task). This is also time consumming having to go through the whole process of trying to find the events in all the drop down menus.
Though SIM 4.1 has a lot of great features it seems to lack usability in the places that need it the most. Also features that were in the old version, that made a system admins life of managing his servers so much simpler, are not found in the New HP SIM.
Is there someone (email address or phone number) that I can contact to put forward suggestions for features that I (and I am sure many other people also) would like to see in future releases of HP SIM.
I expected HP SIM 4.1 to be like CIM 7 with more features and a different look, yet close to the same usability. I still find CIM 7 faster and far easier to configure than HP SIM 4.1. I am very reluctant to place my HP SIM 4.1 server into production as a result of all this. It seems like HP SIM has become too advanced for its own good.
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
07-12-2004 02:17 AM
07-12-2004 02:17 AM
Re: Lack of usability in SIM 4.1
I would like to point out also that the design of the HP SIM UI was not taken lightly. Lots of feedback about what was good and not so good from the IM7 UI was considered, and from early prototype, the HP SIM UI went through extensive user testing. I understand that the direction taken may not be how you would have done it, but the design was not made in a vacuum.
We are always lookiing for ways to improve the product in the future. Thanks for your feedback.
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
07-12-2004 02:55 AM
07-12-2004 02:55 AM
Re: Lack of usability in SIM 4.1
Thank you for your response.
I do understand that your production team may have looked hard into how CIM 7 was made and developed HP SIM accordingly.
At this moment in time I think I will keep in CIM 7 in place as it makes my job far faster. I don't particularily want to spend hours on trying to configure tasks, events and server groupings in HP SIM when it takes me 5 minutes to do it in CIM 7.
I thank you for fowarding on my message to the relevent team.
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
07-12-2004 03:00 AM
07-12-2004 03:00 AM
Re: Lack of usability in SIM 4.1
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report Inappropriate Content
07-12-2004 03:23 AM
07-12-2004 03:23 AM