Re: C7000 different modules on 3 and 4 slots

 
SOLVED
Go to solution
twigs1
Occasional Advisor

C7000 different modules on 3 and 4 slots

I am involved in the SAN migration process and need to uninstall the Brocade SAN switch that is installed in bays 3 and 4 and replace it with 2 pass-through modules.

If possible I don't want to stop all VMs running on Blade servers and I think in the possibility uninstalling the Brocade installed in slot 3 install passthrough and connect the ports to a new external SAN switch and then the same process with the Brocade installed in slot 4.

Is this scenario possible?

Thank you

1 REPLY 1
TVVJ
HPE Pro
Solution

Re: C7000 different modules on 3 and 4 slots

Hello,

Though I am not an expert, the solution that is proposed sounds that it should technically work with the appropriate configuration on the external SAN switch as what is being proposed is to remove one Brocade SAN switch, install the pass through, wait for the connections to be up and confirmed and then proceed to do so to the second switch.

Before any activity is performed, it is recommended to backup data, configuration and have necessary HA solution available in place and with adequeate downtime notified.

Regards,



I work at HPE
HPE Support Center offers support for your HPE services and products when and how you need it. Get started with HPE Support Center today.
[All opinions expressed here are mine, and not official statements on behalf of Hewlett Packard Enterprise]
Accept or Kudo